Timeline Estimator

Estimate the build schedule from the same model as the cost calculator, then compare modular and traditional construction.

Project details
Bedroom count, construction method, and site complexity drive the schedule.
4 months
Construction duration for this configuration. Permitting is not included.
  • Site preparation3 wk
  • Foundation3 wk
  • Factory build and set5 wk
  • MEP and finishes3 wk
  • Inspections and closeout2 wk
Modular vs traditional
3 months faster with modular

Modular construction

4 months

Traditional construction

7 months

This schedule uses the cost calculator’s timeline model. It is a planning estimate, not a permit commitment. City review times vary.

Preapproved plan schedules

The Studio

400 sq ft · permit 4-6 weeks · build 8-10 weeks

View plan

The One Bedroom

650 sq ft · permit 5-7 weeks · build 10-12 weeks

View plan

The Two Bedroom

850 sq ft · permit 6-8 weeks · build 12-14 weeks

View plan

The Deluxe

1000 sq ft · permit 6-8 weeks · build 14-16 weeks

View plan

The Compact One Bedroom

500 sq ft · permit 4-6 weeks · build 8-10 weeks

View plan

The Family Unit

1200 sq ft · permit 7-9 weeks · build 16-20 weeks

View plan

The Garden Studio

350 sq ft · permit 3-5 weeks · build 7-9 weeks

View plan

The Accessible One Bedroom

700 sq ft · permit 5-7 weeks · build 12-14 weeks